Standby Generator Install — 22 kW, Harborlight Townhomes
Harborlight Townhomes · Building C — Pump House
$23,881
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 332 ft | $2.92 | $969.44 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 3 coil | $253.23 | $759.69 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material20A Double-Pole Breaker | 9 ea | $36.97 | $332.73 |
| Material20A Single-Pole Breaker | 2 ea | $16.25 | $32.50 |
| PermitPermit and inspection fees | 1 ea | $133.35 | $133.35 |
| LaborElectrical labour — generator install | 181.8 hr | $118 | $21,452.45 |
| Total | $23,880.97 | ||
Job photos
4 from the field · click to enlarge
Customer
Harborlight Townhomes
Marcus Winthrop
Property Manager
7617 Cypress Bend Ct
Temple Terrace, FL 33995
Temple Terrace, FL 33995
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 3, 2025
- WonMay 31, 2025
- ScheduledJun 26, 2025