Generator Install + 200A ATS — Harborlight Townhomes

Harborlight Townhomes · Building E — Clubhouse

$19,394
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Includes as-built markup on completion. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material100A Main Breaker Load Center, 24-space5 ea$308.66$1,543.30
MaterialLevel 2 EV Charger, 48A Hardwired3 ea$862.22$2,586.66
Material6 AWG Bare Copper Ground224 ft$2.92$654.08
Material50A Double-Pole Breaker9 ea$58.90$530.10
Material400A Meter Main Combo, 42-space2 ea$1,721.36$3,442.72
Material200A Main Breaker Load Center, 40-space1 ea$609.04$609.04
PermitPermit and inspection fees1 ea$182.64$182.64
LaborElectrical labour — generator install83.4 hr$118.05$9,845.07
Total$19,393.61

Job photos

2 from the field · click to enlarge

Activity

Notes on this job

  • EV
    Emmett VanceSep 18

    Materials staged at the shop, ready for Monday.

  • EV
    Emmett VanceSep 15

    Customer asked to push a week. Rescheduled.

  • AssistantSep 13

    Estimate drafted from the site notes and sent for review.

Customer

Open
Harborlight Townhomes
Marcus Winthrop
Property Manager
6739 Silverbrook Path
Oldsmar, FL 34133
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Aug 29, 2024
  2. Won
    Sep 19, 2024
  3. Scheduled
    Oct 7, 2024
  4. Completed
    Oct 16, 2024