Generator Install + 200A ATS — Harborlight Townhomes
Harborlight Townhomes · Building E — Clubhouse
$19,394
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Includes as-built markup on completion. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material100A Main Breaker Load Center, 24-space | 5 ea | $308.66 | $1,543.30 |
| MaterialLevel 2 EV Charger, 48A Hardwired | 3 ea | $862.22 | $2,586.66 |
| Material6 AWG Bare Copper Ground | 224 ft | $2.92 | $654.08 |
| Material50A Double-Pole Breaker | 9 ea | $58.90 | $530.10 |
| Material400A Meter Main Combo, 42-space | 2 ea | $1,721.36 | $3,442.72 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| PermitPermit and inspection fees | 1 ea | $182.64 | $182.64 |
| LaborElectrical labour — generator install | 83.4 hr | $118.05 | $9,845.07 |
| Total | $19,393.61 | ||
Job photos
2 from the field · click to enlarge
Activity
Notes on this job
- EVEmmett VanceSep 18
Materials staged at the shop, ready for Monday.
- EVEmmett VanceSep 15
Customer asked to push a week. Rescheduled.
- AssistantSep 13
Estimate drafted from the site notes and sent for review.
Customer
Harborlight Townhomes
Marcus Winthrop
Property Manager
6739 Silverbrook Path
Oldsmar, FL 34133
Oldsmar, FL 34133
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdAug 29, 2024
- WonSep 19, 2024
- ScheduledOct 7, 2024
- CompletedOct 16, 2024