Generator Transfer Switch — Clearpoint HOA

Clearpoint HOA · Clubhouse

$17,436
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
MaterialLevel 2 EV Charger, 48A Hardwired10 ea$862.22$8,622.20
Material14/2 NM-B w/ Ground — 250 ft coil2 coil$128.13$256.26
Material6 AWG Bare Copper Ground29 ft$2.92$84.68
PermitPermit and inspection fees1 ea$188.33$188.33
LaborElectrical labour — generator install70.2 hr$118.01$8,284.50
Total$17,435.97

Customer

Open
Clearpoint HOA
Sloane Grimaldi
Community Manager
1841 Lakemont Loop
Temple Terrace, FL 33770
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Oct 19, 2021
  2. Won
    Nov 13, 2021
  3. Scheduled
    Nov 27, 2021
  4. Completed
    Dec 5, 2021