Command Palette
Search for a command to run...
Board
Open
JOB-2274Lead
Generator Transfer Switch — Riverside Villas
Riverside Villas · Building C — Loading Dock
$24,275
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material20A Single-Pole Breaker | 12 ea | $16.25 | $195 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| PermitPermit and inspection fees | 1 ea | $344.12 | $344.12 |
| LaborElectrical labour — generator install | 191.2 hr | $118.02 | $22,566.19 |
| Total | $24,274.88 | ||
Activity
Notes on this job
- AssistantJun 18
Follow-up scheduled — no response to the estimate after 6 days.
- EVEmmett VanceJun 5
Inspection passed first time.
Customer
Riverside Villas
Camille Nakamura
Board President
5333 Copperfield Row
Wesley Chapel, FL 33915
Wesley Chapel, FL 33915
Timeline
- Lead createdMay 31, 2026
