JOB-2274Lead

Generator Transfer Switch — Riverside Villas

Riverside Villas · Building C — Loading Dock

$24,275
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material20A Single-Pole Breaker12 ea$16.25$195
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
PermitPermit and inspection fees1 ea$344.12$344.12
LaborElectrical labour — generator install191.2 hr$118.02$22,566.19
Total$24,274.88

Activity

Notes on this job

  • AssistantJun 18

    Follow-up scheduled — no response to the estimate after 6 days.

  • EV
    Emmett VanceJun 5

    Inspection passed first time.

Customer

Open
Riverside Villas
Camille Nakamura
Board President
5333 Copperfield Row
Wesley Chapel, FL 33915

Timeline

  1. Lead created
    May 31, 2026