2

Command Palette

Search for a command to run...

Board
JOB-2282Paid

Generator Transfer Switch — Riverside Villas

Riverside Villas · Building C — Loading Dock

$19,544
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12/3 NM-B w/ Ground — 250 ft coil3 coil$253.23$759.69
Material6 AWG Bare Copper Ground218 ft$2.92$636.56
Material12 AWG THHN Copper, Black — 500 ft spool3 spool$200.81$602.43
Material4/0 AWG Aluminum SER Cable156 ft$8.22$1,282.32
MaterialLevel 2 EV Charger, 48A Hardwired5 ea$862.22$4,311.10
Material10 AWG THHN Copper, Red — 500 ft spool1 spool$305.45$305.45
PermitPermit and inspection fees1 ea$437.15$437.15
LaborElectrical labour — generator install95 hr$118$11,209.67
Total$19,544.37

Activity

Notes on this job

  • EV
    Emmett VanceJan 14

    Walked the site with the customer. Scope confirmed, no surprises.

  • JA
    Junia AldermanDec 29

    Permit submitted. Waiting on the county.

Customer

Open
Riverside Villas
Camille Nakamura
Board President
5333 Copperfield Row
Wesley Chapel, FL 33915
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Dec 22, 2022
  2. Won
    Jan 17, 2023
  3. Scheduled
    Jan 20, 2023
  4. Completed
    Jan 27, 2023

Documents