3

Command Palette

Search for a command to run...

Board
JOB-2288Paid

Whole-Home Rewire — Main Building, Eastgate Property Management

Eastgate Property Management · Building C — Pump House

$20,301
Rewire

Scope of work

Replace branch circuit wiring and devices throughout. Includes as-built markup on completion. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12 AWG THHN Copper, White — 500 ft spool1 spool$200.81$200.81
Material20A AFCI/GFCI Dual-Function Breaker12 ea$77.40$928.80
Material1/2 in EMT Conduit — 10 ft stick8 ea$16.30$130.40
MaterialSingle-Pole Decora Switch, 15A3 ea$7.19$21.57
Material200A Main Breaker Load Center, 40-space2 ea$609.04$1,218.08
MaterialArc-Flash Warning Label Set2 pack$37.63$75.26
PermitPermit and inspection fees1 ea$293.72$293.72
LaborElectrical labour — rewire147.7 hr$118.03$17,432.51
Total$20,301.15

Job photos

4 from the field · click to enlarge

Activity

Notes on this job

  • AssistantApr 12

    Estimate drafted from the site notes and sent for review.

  • EV
    Emmett VanceMar 15

    Found existing wiring in worse shape than quoted. Flagged to customer.

Customer

Open
Eastgate Property Management
Emmett Alderman
Maintenance Coordinator
2525 Harborlight Way
Temple Terrace, FL 34252
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Mar 15, 2024
  2. Won
    Apr 2, 2024
  3. Scheduled
    Apr 5, 2024
  4. Completed
    Apr 6, 2024

Documents