Panel Upgrade — 100A Service, Imani Cardoza

Imani Cardoza · Primary Site

$5,220
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
Material200A Main Breaker Load Center, 40-space2 ea$609.04$1,218.08
Material4/0 AWG Aluminum SER Cable1 ft$8.22$8.22
PermitPermit and inspection fees1 ea$260.82$260.82
LaborElectrical labour — panel upgrade28.4 hr$117.92$3,348.79
Total$5,220.30

Customer

Open
Imani Cardoza
Imani Cardoza
Homeowner
3062 Clearpoint Sq
Safety Harbor, FL 34250

Timeline

  1. Lead created
    Dec 19, 2024
  2. Bid lost
    Jan 10, 2025

Lost: Went with incumbent contractor