Command Palette
Search for a command to run...
Board
Open
JOB-2462Lost
Panel Replacement — Federal-Style Panel Swap, Rosalind Winthrop
Rosalind Winthrop · Primary Site
$5,131
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Final walkthrough with customer before sign-off. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 165 ft | $2.92 | $481.80 |
| Material20A Double-Pole Breaker | 4 ea | $36.97 | $147.88 |
| Material20A Single-Pole Breaker | 5 ea | $16.25 | $81.25 |
| PermitPermit and inspection fees | 1 ea | $132.87 | $132.87 |
| LaborElectrical labour — panel upgrade | 36.3 hr | $118.10 | $4,286.89 |
| Total | $5,130.69 | ||
Activity
Notes on this job
- AssistantSep 1
Estimate drafted from the site notes and sent for review.
Customer
Rosalind Winthrop
Rosalind Winthrop
Homeowner
1811 Kingfisher Ln
Oldsmar, FL 34054
Oldsmar, FL 34054
Timeline
- Lead createdAug 30, 2026
- Bid lostAug 31, 2026
Lost: Went with incumbent contractor
