Board
JOB-2487Paid

Panel Replacement — Federal-Style Panel Swap, Nadia Castellanos

Nadia Castellanos · Primary Site

$4,429
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Permit and inspection included. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker7 ea$36.97$258.79
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material50A Double-Pole Breaker6 ea$58.90$353.40
Material12 AWG THHN Copper, White — 500 ft spool1 spool$200.81$200.81
PermitPermit and inspection fees1 ea$211.49$211.49
LaborElectrical labour — panel upgrade20.6 hr$118.22$2,435.25
Total$4,428.50

Job photos

2 from the field · click to enlarge

Customer

Open
Nadia Castellanos
Nadia Castellanos
Homeowner
4662 Whitecap Ter
Oldsmar, FL 34551
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Dec 25, 2024
  2. Won
    Jan 18, 2025
  3. Scheduled
    Jan 23, 2025
  4. Completed
    Jan 26, 2025