Command Palette
Search for a command to run...
Board
Open
JOB-2487Paid
Panel Replacement — Federal-Style Panel Swap, Nadia Castellanos
Nadia Castellanos · Primary Site
$4,429
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Permit and inspection included. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 7 ea | $36.97 | $258.79 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material50A Double-Pole Breaker | 6 ea | $58.90 | $353.40 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| PermitPermit and inspection fees | 1 ea | $211.49 | $211.49 |
| LaborElectrical labour — panel upgrade | 20.6 hr | $118.22 | $2,435.25 |
| Total | $4,428.50 | ||
Job photos
2 from the field · click to enlarge
Customer
Nadia Castellanos
Nadia Castellanos
Homeowner
4662 Whitecap Ter
Oldsmar, FL 34551
Oldsmar, FL 34551
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdDec 25, 2024
- WonJan 18, 2025
- ScheduledJan 23, 2025
- CompletedJan 26, 2025
