3

Command Palette

Search for a command to run...

Board
JOB-2517Lost

Panel Replacement — Federal-Style Panel Swap, Tessa Fairbanks

Tessa Fairbanks · Primary Site

$5,972
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material400A Meter Main Combo, 42-space1 ea$1,721.36$1,721.36
Material20A Single-Pole Breaker4 ea$16.25$65
Material10 AWG THHN Copper, Red — 500 ft spool1 spool$305.45$305.45
PermitPermit and inspection fees1 ea$207.63$207.63
LaborElectrical labour — panel upgrade31.1 hr$118.09$3,672.54
Total$5,971.98

Customer

Open
Tessa Fairbanks
Tessa Fairbanks
Homeowner
6515 Tidewater Crossing
Brandon, FL 34496

Timeline

  1. Lead created
    Jan 7, 2026
  2. Bid lost
    Jan 19, 2026

Lost: No response after follow-up

Documents