Generator Transfer Switch — Corey Nakamura
Corey Nakamura · Primary Site
$26,907
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Customer to provide site access during working hours. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material100A Main Breaker Load Center, 24-space | 9 ea | $308.66 | $2,777.94 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material6 AWG Bare Copper Ground | 133 ft | $2.92 | $388.36 |
| PermitPermit and inspection fees | 1 ea | $414.62 | $414.62 |
| LaborElectrical labour — generator install | 193.4 hr | $117.98 | $22,816.54 |
| Total | $26,906.95 | ||
Activity
Notes on this job
- EVEmmett VanceFeb 9
Inspection passed first time.
Customer
Corey Nakamura
Corey Nakamura
Tenant
8039 Sable Ridge Blvd
Tampa, FL 33607
Tampa, FL 33607
Timeline
- Lead createdJan 23, 2024
- Bid lostFeb 17, 2024
Lost: Went with incumbent contractor