3

Command Palette

Search for a command to run...

Board
JOB-2646Lost

Panel Replacement — Federal-Style Panel Swap, Theo Radcliffe

Theo Radcliffe · Primary Site

$4,882
Panel Upgrade

Scope of work

Upgrade electrical service, including meter main and grounding. Existing materials removed and disposed of. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material50A Double-Pole Breaker2 ea$58.90$117.80
Material4/0 AWG Aluminum SER Cable76 ft$8.22$624.72
Material20A Single-Pole Breaker5 ea$16.25$81.25
PermitPermit and inspection fees1 ea$151.34$151.34
LaborElectrical labour — panel upgrade33.1 hr$118.05$3,907.30
Total$4,882.41

Customer

Open
Theo Radcliffe
Theo Radcliffe
Homeowner
4004 Stonegate Cir
Plant City, FL 33786

Timeline

  1. Lead created
    Aug 22, 2025
  2. Bid lost
    Sep 12, 2025

Lost: Price — went with a lower bid

Documents