Command Palette
Search for a command to run...
Board
Open
JOB-2711Paid
Whole-Home Rewire — Front Office, Malik Winthrop
Malik Winthrop · Primary Site
$14,567
Rewire
Scope of work
Replace branch circuit wiring and devices throughout. Final walkthrough with customer before sign-off. Customer to provide site access during working hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialElectrical Tape, 3/4 in — 10 pack | 2 pack | $28.98 | $57.96 |
| MaterialCat6A Riser Cable — 1000 ft box | 1 box | $354.35 | $354.35 |
| MaterialWire Nuts, Assorted — 500 ct | 1 box | $64.94 | $64.94 |
| Material4 in Square Metal Box w/ Mud Ring | 4 ea | $6.54 | $26.16 |
| MaterialAddressable Smoke Detector w/ Base | 4 ea | $142.52 | $570.08 |
| MaterialHorn/Strobe Notification Appliance | 10 ea | $97.58 | $975.80 |
| PermitPermit and inspection fees | 1 ea | $381.45 | $381.45 |
| LaborElectrical labour — rewire | 102.9 hr | $117.95 | $12,136.62 |
| Total | $14,567.36 | ||
Job photos
2 from the field · click to enlarge
Activity
Notes on this job
- AssistantFeb 15
Matched supplier invoice to this job and updated material costs.
- AssistantFeb 9
Follow-up scheduled — no response to the estimate after 6 days.
- EVEmmett VanceFeb 4
Customer asked to push a week. Rescheduled.
Customer
Malik Winthrop
Malik Winthrop
Homeowner
7904 Silverbrook Path
Riverview, FL 34684
Riverview, FL 34684
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdJan 17, 2026
- WonJan 31, 2026
- ScheduledFeb 12, 2026
- CompletedFeb 14, 2026
