JOB-2727Lost
Standby Generator Install — 22 kW, Rosalind Kirkland
Rosalind Kirkland · Primary Site
$28,587
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Permit and inspection included. Customer to provide site access during working hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material50A Double-Pole Breaker | 7 ea | $58.90 | $412.30 |
| Material20A Single-Pole Breaker | 11 ea | $16.25 | $178.75 |
| PermitPermit and inspection fees | 1 ea | $115.79 | $115.79 |
| LaborElectrical labour — generator install | 229.5 hr | $117.98 | $27,076.82 |
| Total | $28,586.90 | ||
Customer
Rosalind Kirkland
Rosalind Kirkland
Homeowner
5299 Silverbrook Path
Safety Harbor, FL 34361
Safety Harbor, FL 34361
Timeline
- Lead createdMay 30, 2025
- Bid lostJun 22, 2025
Lost: Went with incumbent contractor