Command Palette
Search for a command to run...
Board
Open
JOB-2772Paid
Panel Upgrade — 200A Service, Reuben Everly
Reuben Everly · Primary Site
$5,714
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. Permit and inspection included. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 10 ea | $36.97 | $369.70 |
| Material20A Single-Pole Breaker | 5 ea | $16.25 | $81.25 |
| Material400A Meter Main Combo, 42-space | 1 ea | $1,721.36 | $1,721.36 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material6 AWG Bare Copper Ground | 9 ft | $2.92 | $26.28 |
| PermitPermit and inspection fees | 1 ea | $184.90 | $184.90 |
| LaborElectrical labour — panel upgrade | 26.5 hr | $118.11 | $3,129.91 |
| Total | $5,714.21 | ||
Activity
Notes on this job
- EVEmmett VanceApr 13
Customer asked to push a week. Rescheduled.
- AssistantApr 7
Estimate drafted from the site notes and sent for review.
- AssistantMar 18
Matched supplier invoice to this job and updated material costs.
Customer
Reuben Everly
Reuben Everly
Tenant
7297 Sable Ridge Blvd
Temple Terrace, FL 34413
Temple Terrace, FL 34413
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdMar 17, 2025
- WonApr 5, 2025
- ScheduledApr 14, 2025
- CompletedApr 22, 2025
