Command Palette
Search for a command to run...
Board
Open
JOB-2814Paid
Panel Replacement — Federal-Style Panel Swap, Roland Thackeray
Roland Thackeray · Primary Site
$4,633
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Includes as-built markup on completion. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material4/0 AWG Aluminum SER Cable | 200 ft | $8.22 | $1,644 |
| Material6 AWG Bare Copper Ground | 2 ft | $2.92 | $5.84 |
| PermitPermit and inspection fees | 1 ea | $114.89 | $114.89 |
| LaborElectrical labour — panel upgrade | 22.6 hr | $118.02 | $2,667.17 |
| Total | $4,632.71 | ||
Job photos
4 from the field · click to enlarge
Customer
Roland Thackeray
Roland Thackeray
Tenant
8778 Heron Cove Ct
Brandon, FL 34072
Brandon, FL 34072
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdDec 14, 2023
- WonDec 27, 2023
- ScheduledJan 22, 2024
- CompletedJan 26, 2024
