Service Upgrade — 400A Meter Main, Hollis Radcliffe

Hollis Radcliffe · Primary Site

$5,243
Panel Upgrade

Scope of work

Upgrade electrical service, including meter main and grounding. Existing materials removed and disposed of. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material10 AWG THHN Copper, Red — 500 ft spool3 spool$305.45$916.35
Material100A Main Breaker Load Center, 24-space2 ea$308.66$617.32
Material4/0 AWG Aluminum SER Cable26 ft$8.22$213.72
PermitPermit and inspection fees1 ea$312.19$312.19
LaborElectrical labour — panel upgrade27 hr$117.89$3,182.92
Total$5,242.50

Customer

Open
Hollis Radcliffe
Hollis Radcliffe
Homeowner
5093 Fernbank Trl
Oldsmar, FL 33989
Assigned crew
Crew 2 — Service

Timeline

  1. Lead created
    Mar 16, 2023
  2. Won
    Apr 5, 2023
  3. Scheduled
    Apr 27, 2023
  4. Completed
    Apr 28, 2023