Service Upgrade — 100A Meter Main, Grant Everly
Grant Everly · Primary Site
$5,443
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Work to be performed outside business hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 10 ea | $36.97 | $369.70 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material100A Main Breaker Load Center, 24-space | 4 ea | $308.66 | $1,234.64 |
| Material20A AFCI/GFCI Dual-Function Breaker | 1 ea | $77.40 | $77.40 |
| PermitPermit and inspection fees | 1 ea | $118.77 | $118.77 |
| LaborElectrical labour — panel upgrade | 28.7 hr | $118 | $3,386.56 |
| Total | $5,443.33 | ||
Activity
Notes on this job
- AssistantMay 10
Estimate drafted from the site notes and sent for review.
Customer
Grant Everly
Grant Everly
Homeowner
5456 Brightwater Ave
Safety Harbor, FL 34315
Safety Harbor, FL 34315
Timeline
- Lead createdMay 6, 2023
- Bid lostMay 27, 2023
Lost: Project cancelled by owner