2

Command Palette

Search for a command to run...

Board
JOB-2910Lost

Service Upgrade — 100A Meter Main, Grant Everly

Grant Everly · Primary Site

$5,443
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker10 ea$36.97$369.70
Material14/2 NM-B w/ Ground — 250 ft coil2 coil$128.13$256.26
Material100A Main Breaker Load Center, 24-space4 ea$308.66$1,234.64
Material20A AFCI/GFCI Dual-Function Breaker1 ea$77.40$77.40
PermitPermit and inspection fees1 ea$118.77$118.77
LaborElectrical labour — panel upgrade28.7 hr$118$3,386.56
Total$5,443.33

Activity

Notes on this job

  • AssistantMay 10

    Estimate drafted from the site notes and sent for review.

Customer

Open
Grant Everly
Grant Everly
Homeowner
5456 Brightwater Ave
Safety Harbor, FL 34315

Timeline

  1. Lead created
    May 6, 2023
  2. Bid lost
    May 27, 2023

Lost: Project cancelled by owner

Documents