2

Command Palette

Search for a command to run...

Board
JOB-2921Paid

EV Charging Expansion Phase 2 — Arturo Whitaker

Arturo Whitaker · Primary Site

$11,408
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Single-Pole Breaker8 ea$16.25$130
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
Material8 AWG THHN Copper — 500 ft spool3 spool$484.38$1,453.14
MaterialLevel 2 EV Charger, 48A Hardwired2 ea$862.22$1,724.44
LaborElectrical labour — ev charger install66.9 hr$118.08$7,899.77
Total$11,408.16

Job photos

3 from the field · click to enlarge

Customer

Open
Arturo Whitaker
Arturo Whitaker
Homeowner
3582 Sawgrass Reach Dr
Largo, FL 33644
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 22, 2025
  2. Won
    Aug 16, 2025
  3. Scheduled
    Aug 21, 2025
  4. Completed
    Aug 23, 2025

Documents