EV Charging Expansion Phase 2 — Silas Thackeray
Silas Thackeray · Primary Site
$8,316
EV Charger Install
Scope of work
Add EV charging capacity including panel work and conduit run. Includes as-built markup on completion. Work to be performed outside business hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| Material20A AFCI/GFCI Dual-Function Breaker | 9 ea | $77.40 | $696.60 |
| Material50A Double-Pole Breaker | 5 ea | $58.90 | $294.50 |
| MaterialAutomatic Transfer Switch, 200A | 1 ea | $1,553.66 | $1,553.66 |
| Material4/0 AWG Aluminum SER Cable | 31 ft | $8.22 | $254.82 |
| Material6 AWG Bare Copper Ground | 2 ft | $2.92 | $5.84 |
| LaborElectrical labour — ev charger install | 44.6 hr | $117.88 | $5,257.39 |
| Total | $8,316.04 | ||
Customer
Silas Thackeray
Silas Thackeray
Tenant
8452 Osprey Landing Blvd
Temple Terrace, FL 34058
Temple Terrace, FL 34058
Timeline
- Lead createdMay 12, 2025
- Bid lostMay 29, 2025
Lost: Project cancelled by owner