Command Palette
Search for a command to run...
Board
Open
JOB-3012Paid
Panel Upgrade — 400A Service + Surge Protection, Roland Beckett
Roland Beckett · Primary Site
$5,571
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Customer to provide site access during working hours. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material50A Double-Pole Breaker | 4 ea | $58.90 | $235.60 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 2 coil | $253.23 | $506.46 |
| MaterialType 2 Whole-Home Surge Protective Device | 1 ea | $260.71 | $260.71 |
| PermitPermit and inspection fees | 1 ea | $450.11 | $450.11 |
| LaborElectrical labour — panel upgrade | 25.9 hr | $118.08 | $3,058.29 |
| Total | $5,570.67 | ||
Customer
Roland Beckett
Roland Beckett
Homeowner
2534 Stonegate Cir
Brandon, FL 34183
Brandon, FL 34183
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdAug 4, 2022
- WonAug 21, 2022
- ScheduledSep 12, 2022
- CompletedSep 13, 2022
