Panel Upgrade — 200A Service, Colette Quintero
Colette Quintero · Primary Site
$4,004
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. All work per NEC and local amendments. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material20A Single-Pole Breaker | 10 ea | $16.25 | $162.50 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| PermitPermit and inspection fees | 1 ea | $209.93 | $209.93 |
| LaborElectrical labour — panel upgrade | 22.2 hr | $118.05 | $2,620.74 |
| Total | $4,003.83 | ||
Customer
Colette Quintero
Colette Quintero
Homeowner
9167 Brightwater Ave
Brandon, FL 33724
Brandon, FL 33724
Timeline
- Lead createdJul 30, 2026