Scope of work
Remove obsolete panel and install new load center. Final walkthrough with customer before sign-off. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material50A Double-Pole Breaker | 4 ea | $58.90 | $235.60 |
| Material12 AWG THHN Copper, White — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| PermitPermit and inspection fees | 1 ea | $463.84 | $463.84 |
| LaborElectrical labour — panel upgrade | 22.5 hr | $117.77 | $2,649.88 |
| Total | $4,353.37 | ||