Command Palette
Search for a command to run...
Board
Open
JOB-3136Lost
Panel Upgrade — 200A Service + Surge Protection, Victor Alderman — North
Victor Alderman — North · Primary Site
$5,640
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Includes as-built markup on completion. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material50A Double-Pole Breaker | 6 ea | $58.90 | $353.40 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 1 spool | $305.45 | $305.45 |
| Material20A Double-Pole Breaker | 11 ea | $36.97 | $406.67 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| PermitPermit and inspection fees | 1 ea | $246.72 | $246.72 |
| LaborElectrical labour — panel upgrade | 25.7 hr | $117.90 | $3,030.12 |
| Total | $5,640.06 | ||
Customer
Victor Alderman — North
Victor Alderman — North
Homeowner
2951 Marsh Landing Pkwy
Clearwater, FL 33729
Clearwater, FL 33729
Timeline
- Lead createdJul 7, 2024
- Bid lostJul 17, 2024
Lost: Price — went with a lower bid
