2

Command Palette

Search for a command to run...

Board
JOB-3136Lost

Panel Upgrade — 200A Service + Surge Protection, Victor Alderman — North

Victor Alderman — North · Primary Site

$5,640
Panel Upgrade

Scope of work

Upgrade electrical service, including meter main and grounding. Includes as-built markup on completion. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material50A Double-Pole Breaker6 ea$58.90$353.40
Material10 AWG THHN Copper, Red — 500 ft spool1 spool$305.45$305.45
Material20A Double-Pole Breaker11 ea$36.97$406.67
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
PermitPermit and inspection fees1 ea$246.72$246.72
LaborElectrical labour — panel upgrade25.7 hr$117.90$3,030.12
Total$5,640.06

Customer

Open
Victor Alderman — North
Victor Alderman — North
Homeowner
2951 Marsh Landing Pkwy
Clearwater, FL 33729

Timeline

  1. Lead created
    Jul 7, 2024
  2. Bid lost
    Jul 17, 2024

Lost: Price — went with a lower bid

Documents