Command Palette
Search for a command to run...
Board
Open
JOB-3142Lost
Panel Upgrade — 100A Service, Silas Fairbanks
Silas Fairbanks · Primary Site
$4,926
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material50A Double-Pole Breaker | 2 ea | $58.90 | $117.80 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| PermitPermit and inspection fees | 1 ea | $283.14 | $283.14 |
| LaborElectrical labour — panel upgrade | 31.5 hr | $117.94 | $3,715.05 |
| Total | $4,925.84 | ||
Customer
Silas Fairbanks
Silas Fairbanks
Homeowner
3949 Fernbank Trl
Seminole, FL 33999
Seminole, FL 33999
Timeline
- Lead createdMar 12, 2023
- Bid lostMar 28, 2023
Lost: Price — went with a lower bid
