3

Command Palette

Search for a command to run...

Board
JOB-3147Paid

Panel Upgrade — 400A Service + Surge Protection, Sloane Castellanos — North

Sloane Castellanos — North · Primary Site

$4,266
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Permit and inspection included. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material20A Double-Pole Breaker9 ea$36.97$332.73
Material50A Double-Pole Breaker1 ea$58.90$58.90
Material4/0 AWG Aluminum SER Cable12 ft$8.22$98.64
PermitPermit and inspection fees1 ea$450.54$450.54
LaborElectrical labour — panel upgrade20 hr$117.83$2,356.51
Total$4,266.08

Job photos

2 from the field · click to enlarge

Customer

Open
Sloane Castellanos — North
Sloane Castellanos — North
Homeowner
2651 Sable Ridge Blvd
Oldsmar, FL 34616
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Oct 3, 2025
  2. Won
    Oct 20, 2025
  3. Scheduled
    Nov 11, 2025
  4. Completed
    Nov 17, 2025

Documents