Command Palette
Search for a command to run...
Board
Open
JOB-3147Paid
Panel Upgrade — 400A Service + Surge Protection, Sloane Castellanos — North
Sloane Castellanos — North · Primary Site
$4,266
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Permit and inspection included. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material20A Double-Pole Breaker | 9 ea | $36.97 | $332.73 |
| Material50A Double-Pole Breaker | 1 ea | $58.90 | $58.90 |
| Material4/0 AWG Aluminum SER Cable | 12 ft | $8.22 | $98.64 |
| PermitPermit and inspection fees | 1 ea | $450.54 | $450.54 |
| LaborElectrical labour — panel upgrade | 20 hr | $117.83 | $2,356.51 |
| Total | $4,266.08 | ||
Job photos
2 from the field · click to enlarge
Customer
Sloane Castellanos — North
Sloane Castellanos — North
Homeowner
2651 Sable Ridge Blvd
Oldsmar, FL 34616
Oldsmar, FL 34616
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdOct 3, 2025
- WonOct 20, 2025
- ScheduledNov 11, 2025
- CompletedNov 17, 2025
