2

Command Palette

Search for a command to run...

Board
JOB-3195Paid

EV Charging Expansion Phase 2 — Reuben Winthrop — East

Reuben Winthrop — East · Primary Site

$9,135
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Includes as-built markup on completion. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12/3 NM-B w/ Ground — 250 ft coil1 coil$253.23$253.23
Material4/0 AWG Aluminum SER Cable305 ft$8.22$2,507.10
Material200A Main Breaker Load Center, 40-space1 ea$609.04$609.04
Material100A Main Breaker Load Center, 24-space1 ea$308.66$308.66
Material6 AWG Bare Copper Ground23 ft$2.92$67.16
LaborElectrical labour — ev charger install45.7 hr$117.94$5,389.76
Total$9,134.95

Job photos

3 from the field · click to enlarge

Activity

Notes on this job

  • EV
    Emmett VanceDec 16

    Found existing wiring in worse shape than quoted. Flagged to customer.

  • AssistantDec 12

    Matched supplier invoice to this job and updated material costs.

  • AssistantDec 7

    Invoice prepared and queued for approval.

Customer

Open
Reuben Winthrop — East
Reuben Winthrop — East
Tenant
9527 Lakemont Loop
Safety Harbor, FL 33929
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Dec 7, 2025
  2. Won
    Dec 21, 2025
  3. Scheduled
    Jan 5, 2026
  4. Completed
    Jan 10, 2026

Documents