Troubleshoot — Voltage Drop on Main Building Feeder, Silas Fairbanks — North

Silas Fairbanks — North · Primary Site

$619
Troubleshooting

Scope of work

Trace intermittent fault and identify root cause. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material2 in EMT Conduit — 10 ft stick1 ea$65.21$65.21
Material50A Double-Pole Breaker1 ea$58.90$58.90
Material20A Single-Pole Breaker1 ea$16.25$16.25
LaborElectrical labour — troubleshooting4.1 hr$116.79$478.82
Total$619.18

Job photos

4 from the field · click to enlarge

Customer

Open
Silas Fairbanks — North
Silas Fairbanks — North
Tenant
5642 Silverbrook Path
Temple Terrace, FL 34094
Assigned crew
Crew 2 — Service

Timeline

  1. Lead created
    Oct 14, 2025
  2. Won
    Oct 27, 2025
  3. Scheduled
    Nov 18, 2025
  4. Completed
    Nov 22, 2025