Command Palette
Search for a command to run...
Board
Open
JOB-3296Paid
Panel Replacement — Federal-Style Panel Swap, Bethany Fairbanks — East
Bethany Fairbanks — East · Primary Site
$4,590
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Includes as-built markup on completion. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material20A AFCI/GFCI Dual-Function Breaker | 9 ea | $77.40 | $696.60 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material50A Double-Pole Breaker | 2 ea | $58.90 | $117.80 |
| PermitPermit and inspection fees | 1 ea | $155.85 | $155.85 |
| LaborElectrical labour — panel upgrade | 25.6 hr | $117.88 | $3,017.75 |
| Total | $4,590.43 | ||
Job photos
2 from the field · click to enlarge
Customer
Bethany Fairbanks — East
Bethany Fairbanks — East
Homeowner
7076 Lakemont Loop
Oldsmar, FL 33725
Oldsmar, FL 33725
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 13, 2025
- WonMay 26, 2025
- ScheduledJun 9, 2025
- CompletedJun 14, 2025
