Open
JOB-1376Lost
EV Charger Install (17 ports) — Silverbrook Municipal Utility
Silverbrook Municipal Utility · Warehouse
$8,887
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Work to be performed outside business hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12/3 NM-B w/ Ground — 250 ft coil | 3 coil | $253.23 | $759.69 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 1 spool | $305.45 | $305.45 |
| LaborElectrical labour — ev charger install | 66.3 hr | $117.98 | $7,821.79 |
| Total | $8,886.93 | ||
Activity
Notes on this job
- AssistantFeb 7
Estimate drafted from the site notes and sent for review.
- EVEmmett VanceJan 30
Found existing wiring in worse shape than quoted. Flagged to customer.
Customer
Silverbrook Municipal Utility
Emmett Hollingsworth
Operations Manager
637 Silverbrook Path
Lutz, FL 33822
Lutz, FL 33822
Timeline
- Lead createdJan 12, 2023
- Bid lostJan 31, 2023
Lost: No response after follow-up