Panel Upgrade — 200A Service, Silverbrook Condominium Association
Silverbrook Condominium Association · Building A — Storage Wing
$3,758
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material10 AWG THHN Copper, Red — 500 ft spool | 3 spool | $305.45 | $916.35 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material20A Single-Pole Breaker | 8 ea | $16.25 | $130 |
| Material4/0 AWG Aluminum SER Cable | 19 ft | $8.22 | $156.18 |
| PermitPermit and inspection fees | 1 ea | $461.89 | $461.89 |
| LaborElectrical labour — panel upgrade | 15.6 hr | $117.79 | $1,837.49 |
| Total | $3,758.17 | ||
Job photos
2 from the field · click to enlarge
Activity
Notes on this job
- AssistantMay 15
Estimate drafted from the site notes and sent for review.
Customer
Silverbrook Condominium Association
Owen Okafor
Property Manager
7242 Lakemont Loop
Tampa, FL 34127
Tampa, FL 34127
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 4, 2023
- WonMay 20, 2023
- ScheduledJun 1, 2023
- CompletedJun 6, 2023