Command Palette
Search for a command to run...
Board
Open
JOB-1748Estimate Sent
Panel Upgrade — 100A Service, Silverbrook Condominium Association
Silverbrook Condominium Association · Building A — Storage Wing
$4,090
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Permit and inspection included. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material14/2 NM-B w/ Ground — 250 ft coil | 3 coil | $128.13 | $384.39 |
| Material6 AWG Bare Copper Ground | 119 ft | $2.92 | $347.48 |
| Material20A Single-Pole Breaker | 12 ea | $16.25 | $195 |
| MaterialType 2 Whole-Home Surge Protective Device | 2 ea | $260.71 | $521.42 |
| PermitPermit and inspection fees | 1 ea | $360.37 | $360.37 |
| LaborElectrical labour — panel upgrade | 19.3 hr | $118.20 | $2,281.33 |
| Total | $4,089.99 | ||
Customer
Silverbrook Condominium Association
Owen Okafor
Property Manager
7242 Lakemont Loop
Tampa, FL 34127
Tampa, FL 34127
Timeline
- Lead createdJul 4, 2026
