JOB-1748Estimate Sent

Panel Upgrade — 100A Service, Silverbrook Condominium Association

Silverbrook Condominium Association · Building A — Storage Wing

$4,090
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Permit and inspection included. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
Material6 AWG Bare Copper Ground119 ft$2.92$347.48
Material20A Single-Pole Breaker12 ea$16.25$195
MaterialType 2 Whole-Home Surge Protective Device2 ea$260.71$521.42
PermitPermit and inspection fees1 ea$360.37$360.37
LaborElectrical labour — panel upgrade19.3 hr$118.20$2,281.33
Total$4,089.99