Panel Upgrade — 200A Service, Silverbrook Condominium Association
Silverbrook Condominium Association · Building A — Storage Wing
$4,111
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Existing materials removed and disposed of. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material4/0 AWG Aluminum SER Cable | 55 ft | $8.22 | $452.10 |
| Material50A Double-Pole Breaker | 8 ea | $58.90 | $471.20 |
| Material100A Main Breaker Load Center, 24-space | 1 ea | $308.66 | $308.66 |
| PermitPermit and inspection fees | 1 ea | $268.29 | $268.29 |
| LaborElectrical labour — panel upgrade | 22.1 hr | $118.15 | $2,611.08 |
| Total | $4,111.33 | ||
Activity
Notes on this job
- JAJunia AldermanAug 5
Inspection passed first time.
- JAJunia AldermanJul 28
Permit submitted. Waiting on the county.
- JAJunia AldermanJul 27
Walked the site with the customer. Scope confirmed, no surprises.