3

Command Palette

Search for a command to run...

Board
JOB-1791Paid

EV Charger Install (9 ports) — Silverbrook Condominium Association

Silverbrook Condominium Association · Building C — Pump House

$11,472
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material14/2 NM-B w/ Ground — 250 ft coil2 coil$128.13$256.26
Material200A Main Breaker Load Center, 40-space3 ea$609.04$1,827.12
MaterialLevel 2 EV Charger, 48A Hardwired1 ea$862.22$862.22
LaborElectrical labour — ev charger install64 hr$118.09$7,557.52
Total$11,471.88

Job photos

2 from the field · click to enlarge

Customer

Open
Silverbrook Condominium Association
Owen Okafor
Property Manager
4739 Egret Point Rd
St. Petersburg, FL 33831
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Mar 4, 2025
  2. Won
    Mar 22, 2025
  3. Scheduled
    Apr 17, 2025
  4. Completed
    Apr 18, 2025

Documents