Command Palette
Search for a command to run...
Board
Open
JOB-1791Paid
EV Charger Install (9 ports) — Silverbrook Condominium Association
Silverbrook Condominium Association · Building C — Pump House
$11,472
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material200A Main Breaker Load Center, 40-space | 3 ea | $609.04 | $1,827.12 |
| MaterialLevel 2 EV Charger, 48A Hardwired | 1 ea | $862.22 | $862.22 |
| LaborElectrical labour — ev charger install | 64 hr | $118.09 | $7,557.52 |
| Total | $11,471.88 | ||
Job photos
2 from the field · click to enlarge
Customer
Silverbrook Condominium Association
Owen Okafor
Property Manager
4739 Egret Point Rd
St. Petersburg, FL 33831
St. Petersburg, FL 33831
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMar 4, 2025
- WonMar 22, 2025
- ScheduledApr 17, 2025
- CompletedApr 18, 2025
