JOB-1874Scheduled
Generator Transfer Switch — Sandpiper Residences
Sandpiper Residences · Front Office
$22,720
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| Material20A Double-Pole Breaker | 12 ea | $36.97 | $443.64 |
| Material50A Double-Pole Breaker | 10 ea | $58.90 | $589 |
| PermitPermit and inspection fees | 1 ea | $408.51 | $408.51 |
| LaborElectrical labour — generator install | 178.2 hr | $117.99 | $21,025.70 |
| Total | $22,720.08 | ||
Job photos
3 from the field · click to enlarge
Activity
Notes on this job
- AssistantAug 24
Estimate drafted from the site notes and sent for review.
- EVEmmett VanceAug 9
Walked the site with the customer. Scope confirmed, no surprises.
Customer
Sandpiper Residences
Marisol Jessup
Property Manager
1816 Copperfield Row
St. Petersburg, FL 33717
St. Petersburg, FL 33717
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdAug 1, 2026
- WonAug 24, 2026
- ScheduledSep 4, 2026