3

Command Palette

Search for a command to run...

Board
JOB-1874Scheduled

Generator Transfer Switch — Sandpiper Residences

Sandpiper Residences · Front Office

$22,720
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12/3 NM-B w/ Ground — 250 ft coil1 coil$253.23$253.23
Material20A Double-Pole Breaker12 ea$36.97$443.64
Material50A Double-Pole Breaker10 ea$58.90$589
PermitPermit and inspection fees1 ea$408.51$408.51
LaborElectrical labour — generator install178.2 hr$117.99$21,025.70
Total$22,720.08

Job photos

3 from the field · click to enlarge

Activity

Notes on this job

  • AssistantAug 24

    Estimate drafted from the site notes and sent for review.

  • EV
    Emmett VanceAug 9

    Walked the site with the customer. Scope confirmed, no surprises.

Customer

Open
Sandpiper Residences
Marisol Jessup
Property Manager
1816 Copperfield Row
St. Petersburg, FL 33717
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Aug 1, 2026
  2. Won
    Aug 24, 2026
  3. Scheduled
    Sep 4, 2026

Documents