JOB-1962Paid
Standby Generator Install — 22 kW, Silverbrook Apartments
Silverbrook Apartments · Building A — Main Building
$17,594
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialLevel 2 EV Charger, 48A Hardwired | 10 ea | $862.22 | $8,622.20 |
| Material20A Single-Pole Breaker | 7 ea | $16.25 | $113.75 |
| Material50A Double-Pole Breaker | 3 ea | $58.90 | $176.70 |
| Material4/0 AWG Aluminum SER Cable | 27 ft | $8.22 | $221.94 |
| PermitPermit and inspection fees | 1 ea | $369.10 | $369.10 |
| LaborElectrical labour — generator install | 68.6 hr | $117.93 | $8,089.98 |
| Total | $17,593.67 | ||
Job photos
2 from the field · click to enlarge
Customer
Silverbrook Apartments
Anika Alderman
Regional Manager
8546 Sawgrass Reach Dr
Lutz, FL 33885
Lutz, FL 33885
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 13, 2023
- WonJul 21, 2023
- ScheduledAug 14, 2023
- CompletedAug 23, 2023