Standby Generator Install — 22 kW, Silverbrook Apartments

Silverbrook Apartments · Building A — Main Building

$17,594
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
MaterialLevel 2 EV Charger, 48A Hardwired10 ea$862.22$8,622.20
Material20A Single-Pole Breaker7 ea$16.25$113.75
Material50A Double-Pole Breaker3 ea$58.90$176.70
Material4/0 AWG Aluminum SER Cable27 ft$8.22$221.94
PermitPermit and inspection fees1 ea$369.10$369.10
LaborElectrical labour — generator install68.6 hr$117.93$8,089.98
Total$17,593.67

Job photos

2 from the field · click to enlarge

Customer

Open
Silverbrook Apartments
Anika Alderman
Regional Manager
8546 Sawgrass Reach Dr
Lutz, FL 33885
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 13, 2023
  2. Won
    Jul 21, 2023
  3. Scheduled
    Aug 14, 2023
  4. Completed
    Aug 23, 2023