Command Palette
Search for a command to run...
Board
Open
JOB-1963Paid
Generator Transfer Switch — Copperfield Condominium Association
Copperfield Condominium Association · Building B — Loading Dock
$24,311
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialLevel 2 EV Charger, 48A Hardwired | 2 ea | $862.22 | $1,724.44 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| MaterialAir-Cooled Standby Generator, 22 kW | 1 ea | $6,581.52 | $6,581.52 |
| MaterialType 2 Whole-Home Surge Protective Device | 12 ea | $260.71 | $3,128.52 |
| PermitPermit and inspection fees | 1 ea | $151.10 | $151.10 |
| LaborElectrical labour — generator install | 104.4 hr | $118.04 | $12,323.50 |
| Total | $24,310.70 | ||
Activity
Notes on this job
- JAJunia AldermanNov 8
Customer asked to push a week. Rescheduled.
Customer
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Temple Terrace, FL 33702
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdOct 15, 2025
- WonOct 30, 2025
- ScheduledNov 21, 2025
- CompletedNov 22, 2025
