Board
JOB-1963Paid

Generator Transfer Switch — Copperfield Condominium Association

Copperfield Condominium Association · Building B — Loading Dock

$24,311
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
MaterialLevel 2 EV Charger, 48A Hardwired2 ea$862.22$1,724.44
Material12 AWG THHN Copper, Black — 500 ft spool2 spool$200.81$401.62
MaterialAir-Cooled Standby Generator, 22 kW1 ea$6,581.52$6,581.52
MaterialType 2 Whole-Home Surge Protective Device12 ea$260.71$3,128.52
PermitPermit and inspection fees1 ea$151.10$151.10
LaborElectrical labour — generator install104.4 hr$118.04$12,323.50
Total$24,310.70

Activity

Notes on this job

  • JA
    Junia AldermanNov 8

    Customer asked to push a week. Rescheduled.

Customer

Open
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Oct 15, 2025
  2. Won
    Oct 30, 2025
  3. Scheduled
    Nov 21, 2025
  4. Completed
    Nov 22, 2025

Documents