Generator Transfer Switch — Silverbrook Apartments

Silverbrook Apartments · Main Building

$17,109
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Existing materials removed and disposed of. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material4/0 AWG Aluminum SER Cable256 ft$8.22$2,104.32
Material20A Double-Pole Breaker7 ea$36.97$258.79
Material6 AWG Bare Copper Ground108 ft$2.92$315.36
Material8 AWG THHN Copper — 500 ft spool3 spool$484.38$1,453.14
PermitPermit and inspection fees1 ea$284.48$284.48
LaborElectrical labour — generator install107.6 hr$117.96$12,692.51
Total$17,108.60

Activity

Notes on this job

  • JA
    Junia AldermanNov 1

    Walked the site with the customer. Scope confirmed, no surprises.

  • EV
    Emmett VanceOct 24

    Inspection passed first time.

Customer

Open
Silverbrook Apartments
Anika Alderman
Regional Manager
3273 Marsh Landing Pkwy
Tampa, FL 33809

Timeline

  1. Lead created
    Oct 7, 2020
  2. Bid lost
    Oct 29, 2020

Lost: Price — went with a lower bid