Panel Replacement — Federal-Style Panel Swap, Sable Ridge HOA

Sable Ridge HOA · Main Building

$3,149
Panel Upgrade

Scope of work

Replace existing service panel and bring to current code. Includes as-built markup on completion.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker8 ea$36.97$295.76
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material100A Main Breaker Load Center, 24-space1 ea$308.66$308.66
PermitPermit and inspection fees1 ea$198.66$198.66
LaborElectrical labour — panel upgrade18.8 hr$117.99$2,218.26
Total$3,149.47

Activity

Notes on this job

  • AssistantApr 7

    Estimate drafted from the site notes and sent for review.

  • EV
    Emmett VanceMar 28

    Customer asked to push a week. Rescheduled.

Customer

Open
Sable Ridge HOA
Dominic Fairbanks
Property Manager
477 Fernbank Trl
Safety Harbor, FL 34364

Timeline

  1. Lead created
    Mar 25, 2024
  2. Bid lost
    Apr 5, 2024

Lost: Price — went with a lower bid