JOB-2003Paid
Generator Transfer Switch — Sable Ridge HOA
Sable Ridge HOA · Main Building
$23,079
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Customer to provide site access during working hours. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material200A Main Breaker Load Center, 40-space | 12 ea | $609.04 | $7,308.48 |
| Material4/0 AWG Aluminum SER Cable | 121 ft | $8.22 | $994.62 |
| PermitPermit and inspection fees | 1 ea | $286.92 | $286.92 |
| LaborElectrical labour — generator install | 122.8 hr | $117.99 | $14,488.84 |
| Total | $23,078.86 | ||
Job photos
2 from the field · click to enlarge
Customer
Sable Ridge HOA
Dominic Fairbanks
Property Manager
477 Fernbank Trl
Safety Harbor, FL 34364
Safety Harbor, FL 34364
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 15, 2026
- WonJun 6, 2026
- ScheduledJun 22, 2026
- CompletedJun 29, 2026