Command Palette
Search for a command to run...
Board
Open
JOB-2012Paid
Standby Generator Install — 22 kW, Copperfield Condominium Association
Copperfield Condominium Association · Building B — Loading Dock
$26,088
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A AFCI/GFCI Dual-Function Breaker | 5 ea | $77.40 | $387 |
| MaterialCommercial Dual-Port EV Pedestal | 2 ea | $4,994.60 | $9,989.20 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 2 coil | $253.23 | $506.46 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material400A Meter Main Combo, 42-space | 1 ea | $1,721.36 | $1,721.36 |
| PermitPermit and inspection fees | 1 ea | $391.40 | $391.40 |
| LaborElectrical labour — generator install | 102.7 hr | $118.06 | $12,124.30 |
| Total | $26,088.48 | ||
Job photos
3 from the field · click to enlarge
Customer
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Temple Terrace, FL 33702
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 23, 2023
- WonAug 13, 2023
- ScheduledAug 16, 2023
- CompletedAug 19, 2023
