2

Command Palette

Search for a command to run...

Board
JOB-2012Paid

Standby Generator Install — 22 kW, Copperfield Condominium Association

Copperfield Condominium Association · Building B — Loading Dock

$26,088
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A AFCI/GFCI Dual-Function Breaker5 ea$77.40$387
MaterialCommercial Dual-Port EV Pedestal2 ea$4,994.60$9,989.20
Material12/3 NM-B w/ Ground — 250 ft coil2 coil$253.23$506.46
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
Material400A Meter Main Combo, 42-space1 ea$1,721.36$1,721.36
PermitPermit and inspection fees1 ea$391.40$391.40
LaborElectrical labour — generator install102.7 hr$118.06$12,124.30
Total$26,088.48

Job photos

3 from the field · click to enlarge

Customer

Open
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 23, 2023
  2. Won
    Aug 13, 2023
  3. Scheduled
    Aug 16, 2023
  4. Completed
    Aug 19, 2023

Documents