Standby Generator Install — 22 kW, Copperfield Condominium Association
Copperfield Condominium Association · Building B — Loading Dock
$21,224
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 2 ea | $36.97 | $73.94 |
| Material400A Meter Main Combo, 42-space | 5 ea | $1,721.36 | $8,606.80 |
| Material100A Main Breaker Load Center, 24-space | 6 ea | $308.66 | $1,851.96 |
| Material20A AFCI/GFCI Dual-Function Breaker | 10 ea | $77.40 | $774 |
| PermitPermit and inspection fees | 1 ea | $341.43 | $341.43 |
| LaborElectrical labour — generator install | 81.2 hr | $117.93 | $9,575.79 |
| Total | $21,223.92 | ||
Job photos
4 from the field · click to enlarge
Activity
Notes on this job
- AssistantDec 27
Follow-up scheduled — no response to the estimate after 6 days.
- AssistantDec 23
Estimate drafted from the site notes and sent for review.
- JAJunia AldermanDec 21
Found existing wiring in worse shape than quoted. Flagged to customer.
Customer
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Temple Terrace, FL 33702
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdDec 1, 2023
- WonDec 15, 2023
- ScheduledDec 26, 2023
- CompletedDec 29, 2023