Generator Transfer Switch — Sable Ridge HOA
Sable Ridge HOA · Parking Structure
$13,186
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| MaterialType 2 Whole-Home Surge Protective Device | 8 ea | $260.71 | $2,085.68 |
| Material20A AFCI/GFCI Dual-Function Breaker | 2 ea | $77.40 | $154.80 |
| Material20A Double-Pole Breaker | 10 ea | $36.97 | $369.70 |
| PermitPermit and inspection fees | 1 ea | $131.39 | $131.39 |
| LaborElectrical labour — generator install | 87.4 hr | $118.04 | $10,316.58 |
| Total | $13,186.28 | ||
Job photos
4 from the field · click to enlarge
Customer
Sable Ridge HOA
Dominic Fairbanks
Property Manager
9222 Tidewater Crossing
Plant City, FL 34407
Plant City, FL 34407
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdDec 14, 2024
- WonDec 30, 2024
- ScheduledJan 10, 2025
- CompletedJan 14, 2025