Generator Transfer Switch — Sable Ridge HOA

Sable Ridge HOA · Parking Structure

$13,186
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Work to be performed outside business hours. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
MaterialType 2 Whole-Home Surge Protective Device8 ea$260.71$2,085.68
Material20A AFCI/GFCI Dual-Function Breaker2 ea$77.40$154.80
Material20A Double-Pole Breaker10 ea$36.97$369.70
PermitPermit and inspection fees1 ea$131.39$131.39
LaborElectrical labour — generator install87.4 hr$118.04$10,316.58
Total$13,186.28

Job photos

4 from the field · click to enlarge

Customer

Open
Sable Ridge HOA
Dominic Fairbanks
Property Manager
9222 Tidewater Crossing
Plant City, FL 34407
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Dec 14, 2024
  2. Won
    Dec 30, 2024
  3. Scheduled
    Jan 10, 2025
  4. Completed
    Jan 14, 2025