Command Palette
Search for a command to run...
Board
Open
JOB-2049Estimate Sent
Panel Upgrade — 400A Service, Sable Ridge HOA
Sable Ridge HOA · Building C — Main Building
$3,844
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material100A Main Breaker Load Center, 24-space | 2 ea | $308.66 | $617.32 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| PermitPermit and inspection fees | 1 ea | $463.36 | $463.36 |
| LaborElectrical labour — panel upgrade | 18.3 hr | $118.07 | $2,160.65 |
| Total | $3,843.76 | ||
Customer
Sable Ridge HOA
Dominic Fairbanks
Property Manager
9867 Stonegate Cir
Oldsmar, FL 34107
Oldsmar, FL 34107
Timeline
- Lead createdJul 4, 2026
