2

Command Palette

Search for a command to run...

Board
JOB-2069Lost

Generator Install + 400A ATS — Sawgrass Reach Property Management

Sawgrass Reach Property Management · Clubhouse

$18,989
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Customer to provide site access during working hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material200A Main Breaker Load Center, 40-space12 ea$609.04$7,308.48
Material12/3 NM-B w/ Ground — 250 ft coil2 coil$253.23$506.46
MaterialLevel 2 EV Charger, 48A Hardwired1 ea$862.22$862.22
MaterialType 2 Whole-Home Surge Protective Device2 ea$260.71$521.42
PermitPermit and inspection fees1 ea$183.90$183.90
LaborElectrical labour — generator install81.4 hr$118.02$9,606.71
Total$18,989.19

Customer

Open
Sawgrass Reach Property Management
Grant Radcliffe
Board President
8424 Egret Point Rd
Seminole, FL 34010

Timeline

  1. Lead created
    Jul 1, 2024
  2. Bid lost
    Jul 23, 2024

Lost: Went with incumbent contractor

Documents