Command Palette
Search for a command to run...
Board
Open
JOB-2114Paid
Panel Replacement — Federal-Style Panel Swap, Heron Cove Villas
Heron Cove Villas · Building B — Front Office
$5,735
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Final walkthrough with customer before sign-off. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| Material20A Double-Pole Breaker | 7 ea | $36.97 | $258.79 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material6 AWG Bare Copper Ground | 153 ft | $2.92 | $446.76 |
| Material20A Single-Pole Breaker | 8 ea | $16.25 | $130 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| PermitPermit and inspection fees | 1 ea | $273.80 | $273.80 |
| LaborElectrical labour — panel upgrade | 31.3 hr | $117.82 | $3,687.65 |
| Total | $5,734.98 | ||
Job photos
3 from the field · click to enlarge
Customer
Heron Cove Villas
Arturo Mercer
Property Manager
4430 Osprey Landing Blvd
Largo, FL 33864
Largo, FL 33864
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdMay 23, 2023
- WonJun 14, 2023
- ScheduledJul 5, 2023
- CompletedJul 6, 2023
