2

Command Palette

Search for a command to run...

Board
JOB-2114Paid

Panel Replacement — Federal-Style Panel Swap, Heron Cove Villas

Heron Cove Villas · Building B — Front Office

$5,735
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Final walkthrough with customer before sign-off. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material20A Double-Pole Breaker7 ea$36.97$258.79
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
Material6 AWG Bare Copper Ground153 ft$2.92$446.76
Material20A Single-Pole Breaker8 ea$16.25$130
Material200A Main Breaker Load Center, 40-space1 ea$609.04$609.04
PermitPermit and inspection fees1 ea$273.80$273.80
LaborElectrical labour — panel upgrade31.3 hr$117.82$3,687.65
Total$5,734.98

Job photos

3 from the field · click to enlarge

Customer

Open
Heron Cove Villas
Arturo Mercer
Property Manager
4430 Osprey Landing Blvd
Largo, FL 33864
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    May 23, 2023
  2. Won
    Jun 14, 2023
  3. Scheduled
    Jul 5, 2023
  4. Completed
    Jul 6, 2023

Documents