Command Palette
Search for a command to run...
Board
Open
JOB-2139Lost
Panel Replacement — Federal-Style Panel Swap, Harborlight Townhomes
Harborlight Townhomes · Building B — Front Office
$4,242
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Final walkthrough with customer before sign-off. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material20A Single-Pole Breaker | 8 ea | $16.25 | $130 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 3 coil | $128.13 | $384.39 |
| Material8 AWG THHN Copper — 500 ft spool | 1 spool | $484.38 | $484.38 |
| PermitPermit and inspection fees | 1 ea | $98.81 | $98.81 |
| LaborElectrical labour — panel upgrade | 21.5 hr | $118.24 | $2,542.17 |
| Total | $4,242.18 | ||
Customer
Harborlight Townhomes
Marcus Winthrop
Property Manager
3082 Ironwood Commerce Dr
Temple Terrace, FL 33770
Temple Terrace, FL 33770
Timeline
- Lead createdAug 25, 2025
- Bid lostSep 17, 2025
Lost: Price — went with a lower bid
