3

Command Palette

Search for a command to run...

Board
JOB-2324Lost

Panel Upgrade — 100A Service, Bayshore Condominium Association

Bayshore Condominium Association · Building B — Storage Wing

$5,113
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Includes as-built markup on completion.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12 AWG THHN Copper, White — 500 ft spool3 spool$200.81$602.43
Material12 AWG THHN Copper, Black — 500 ft spool3 spool$200.81$602.43
Material20A Double-Pole Breaker11 ea$36.97$406.67
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
PermitPermit and inspection fees1 ea$345.17$345.17
LaborElectrical labour — panel upgrade25.7 hr$117.81$3,027.74
Total$5,112.57

Customer

Open
Bayshore Condominium Association
Anika Castellanos
Board President
9605 Ironwood Commerce Dr
Seminole, FL 34514

Timeline

  1. Lead created
    Dec 2, 2024
  2. Bid lost
    Dec 15, 2024

Lost: Price — went with a lower bid

Documents