Command Palette
Search for a command to run...
Board
Open
JOB-2324Lost
Panel Upgrade — 100A Service, Bayshore Condominium Association
Bayshore Condominium Association · Building B — Storage Wing
$5,113
Panel Upgrade
Scope of work
Remove obsolete panel and install new load center. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material20A Double-Pole Breaker | 11 ea | $36.97 | $406.67 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| PermitPermit and inspection fees | 1 ea | $345.17 | $345.17 |
| LaborElectrical labour — panel upgrade | 25.7 hr | $117.81 | $3,027.74 |
| Total | $5,112.57 | ||
Customer
Bayshore Condominium Association
Anika Castellanos
Board President
9605 Ironwood Commerce Dr
Seminole, FL 34514
Seminole, FL 34514
Timeline
- Lead createdDec 2, 2024
- Bid lostDec 15, 2024
Lost: Price — went with a lower bid
