Command Palette
Search for a command to run...
Board
Open
JOB-2325Lost
Panel Replacement — Federal-Style Panel Swap, Bayshore Condominium Association
Bayshore Condominium Association · Building D — Warehouse
$4,896
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 4 ea | $36.97 | $147.88 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material4/0 AWG Aluminum SER Cable | 103 ft | $8.22 | $846.66 |
| Material6 AWG Bare Copper Ground | 1 ft | $2.92 | $2.92 |
| PermitPermit and inspection fees | 1 ea | $251.05 | $251.05 |
| LaborElectrical labour — panel upgrade | 22.7 hr | $118.01 | $2,678.89 |
| Total | $4,896.16 | ||
Customer
Bayshore Condominium Association
Anika Castellanos
Board President
633 Stonegate Cir
Brandon, FL 34035
Brandon, FL 34035
Timeline
- Lead createdJul 11, 2024
- Bid lostAug 5, 2024
Lost: Price — went with a lower bid
