JOB-2338Paid

Service Upgrade — 100A Meter Main, Bayshore Condominium Association

Bayshore Condominium Association · Building A — Parking Structure

$5,144
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A AFCI/GFCI Dual-Function Breaker5 ea$77.40$387
MaterialType 2 Whole-Home Surge Protective Device3 ea$260.71$782.13
Material20A Double-Pole Breaker2 ea$36.97$73.94
Material4/0 AWG Aluminum SER Cable111 ft$8.22$912.42
PermitPermit and inspection fees1 ea$290.69$290.69
LaborElectrical labour — panel upgrade22.9 hr$117.82$2,697.97
Total$5,144.15

Job photos

4 from the field · click to enlarge

Activity

Notes on this job

  • JA
    Junia AldermanApr 2

    Materials staged at the shop, ready for Monday.

  • AssistantMar 19

    Matched supplier invoice to this job and updated material costs.

Customer

Open
Bayshore Condominium Association
Anika Castellanos
Board President
5415 Ironwood Commerce Dr
Palm Harbor, FL 33610
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Mar 13, 2026
  2. Won
    Mar 26, 2026
  3. Scheduled
    Apr 20, 2026
  4. Completed
    Apr 25, 2026